Just moved from Rekordbox and onto a Prime 4, very impressed so far with the hardware.
I’m importing the library (around 13k tracks) into EP from RBX, most seems to import fine; cues, loops etc. However, the ‘date added’ field shows as the date the song was added to EP.
Is it possible to import/pull across the ‘Date added’ from RBX? If not automatically, could the meta be edited manually so it will ‘sort by date added’ on the Prime 4 unit?